skip to content

Stay At Home. Protect the NHS. Save Lives. Please read our Coronavirus update.

Archive posts for April 2019

St. Luke's reordering April update

Posted on the 27th April 2019 at 1:29pm.

Floor insulation (10cm/4”) now laid over concrete and installation of ‘first fix’ low level electrics underway (5 April) Base and drain for font in its new location (7 April). Floor now ready for installation of the pipework for the new under floor...